Spiga

Archive for November, 2007

University of Science and Technology Beijing Gymnasium Judo and Taekwondo venue for the 2008 Beijing Olympic Games

November 16, 07 by Ballz Sports

Img2119030

Bird’s eye view

Venue: University of Science and Technology Beijing Gymnasium (Judo and Taekwondo venue for the 2008 Beijing Olympic Games)

Location:University of Science and Technology Beijing

Total land surface (sq. m.): 23,993

Seats: 4,068 permanent and 3,956 temporary

Functions during the Games: Judo and Taekwondo

Post-Games use: The Gym will serve as a comprehensive indoor center for various sports activities, aquatics and fitness training, and will also be suitable for indoor athletic competitions.

Img2119031

Bird’s eye view

Img2119032

Perspective view from inside

Img2119033

Scenograph

Beijing University of Technology Gymnasium Badminton and Rhythmic Gymnastic venue for the 2008 Beijing Olympic Games

November 16, 07 by Ballz Sports

Img2119034
Effect model

Venue: Beijing University of Technology Gymnasium (Badminton and Rhythmic Gymnastic venue for the 2008 Beijing Olympic Games)

Location: Beijing University of Technology

Total land surface (sq. m.): 22,269

Seats: 7,500

Functions during the Games: Badminton and Rhythmic Gymnastics

Post-Games use: The Gym will provide spaces for activities of students and faculty, whilst facilitating the training of the badminton teams affiliated with the International Badminton Federation and the General Administration of Sports. The gymnasium will ocassionally be open to the public.

Groundbreaking date: June 30, 2005

Img2119035
Effect model

Peking University Gymnasium Table Tennis venue for the 2008 Beijing Olympics

November 16, 07 by Ballz Sports

Img2119027
Bird’s eye view in the daytime

Venue: Peking University Gymnasium (Table Tennis venue for the 2008 Beijing Olympics

Location: Peking University

Total land surface (sq. m.): 26,900

Seats: 6,000 permanent and 2,000 removable

Functions during the Games: Table Tennis

Post-Games use: The Gym can be utilized for a score of competitions, including table tennis, handball, basketball, badminton, and volleyball. The Gym will also meet the needs of physical education, training and recreation.

Img2119028
Night scene
Img2119029
Perspective view from inside

China Agricultural University Gymnasium

November 16, 07 by Ballz Sports

Img2119026
Effect model

Venue: China Agricultural University Gymnasium

Location: China Agricultural University (East Campus)

Total land surface (sq. m.): 23,950

Seats: 6,000 permanent and 2,000 removable

Functions during the Games: Wrestling

Post-Games use: The gym will have a warm-up court and spaces for various sport competitions and large-scale activities, such as badminton, table tennis, gymnastics, volleyball, basketball, handball and indoor football matches.

Groundbreaking date: June, 2005

Shunyi Olympic Rowing-Canoeing Park

November 16, 07 by Ballz Sports

Venue: Shunyi Olympic Rowing-Canoeing Park

Location: Mapo Village, Shunyi District, Beijing

Functions during the Games: Rowing, Canoe/Kayak (flat-water racing and Slalom Racing)

Photo taken on July 27 shows the anemometer instrument on the flat-water bank. Several anemometers are installed along the more than 2,000-meter long racecourse.

Photo taken on July 27 shows the flatwater boathouse and the athlete lounge.

Photo taken on July 27 shows the flatwater racecourse. The course is 2,272 meters long.

Photo taken on July 27 shows the main stands and the terminal tower on the west bank of the east water. 1,200 permanent seats are available in the main stands, where spectators can get a full view of everything.

Photo taken on July 27 shows the large-screen scoreboard. Spectators can have a clear view of the competition with the help of the screen.

Beijing Olympic Stadiums and competition venues

November 16, 07 by Ballz Sports

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Green stadium building,

After featuring the stunning “bubble building” being built for the 2008 Olympics in Beijing, we felt it necessary to mention an equally-awesome structure under construction just across the way. Herzog and DeMeuron’s Olympic Stadium, fondly referred to by some as the “Bird’s Nest,” is a feat of engineering, an aesthetic marvel, and an uber-green machine to boot. What we love most about the stadium’s design is its integration of a myriad complex systems all rolled into such an aesthetically and conceptually simple and stunning object. The Swiss architects describe it best, saying, “The spatial effect of the stadium is novel and radical and yet simple and of an almost archaic immediacy. Its appearance is pure structure. Facade and structure are identical.”

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Green stadium building,

The structure itself is composed of a grid-like formation that serves as both structure and facade, integrating the stairs, walls, and roof into one cohesive system. Instead of form being dictated by function, Herzog and DeMeuron’s design effectively removes the distinction, making function and form one in the same.

Such a large-scale and highly-trafficked building raises questions of waste, efficiency, and cost, but the “Bird’s Nest” seems to pose innovative, green solutions to a variety of potential building issues. Its green features include a rainwater collection system, a translucent roof that provides essential sunlight for the grass below, and a natural, passive ventilation system.

Perhaps the most unique feature of the structure is its “cushion” system which strategically fills the spaces within the building’s facade to regulate wind, weather, and sunlight. On the rooftop, the inflatable cushions fill gaps to weather- and waterproof the stadium. “Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated cushions.” Coincidentally, the cushions will be made from ETFE, the same material used to create the translucency of the “bubble building” across the Olympic park.

Sculptural rather than an architectural sensory overload like many a contemporary stadium, “it meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.”

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, 2008 Olympics Site

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Herzog De Meuron, Beijing Herzog DeMeuron

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Olympic Stadium Interior

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, 2008 Olympics Site, Olympic Stadium Interior, herzog demeuron interior

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Olympic Stadium Interior, herzog demeuron interior

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron, Herzog De Meuron

Tags: Beijing Olympics Stadium, Beijing Olympics Buildings, 2008 beijing olympics buildings, china beijing olympics buildings, 2008 beijing olympic buildings, beijing olympic buildings,2008 beijing olympic stadium, beijing olympic stadiums, beijing olympic stadium construction, beijing olympic stadium 2008, beijing olympic stadium design, beijing olympic stadium pictures, beijing olympic stadium photos, new beijing olympic stadium, beijing olympic stadium architect, beijing olympic stadium china, China Olympics Stadium, China Olympics Buildings, 2008 China olympics buildings, china China olympics buildings, 2008 China olympic buildings, China olympic buildings,2008 China olympic stadium, China olympic stadiums, China olympic stadium construction, China olympic stadium 2008, China olympic stadium design, China olympic stadium pictures, China olympic stadium photos, new China olympic stadium, China olympic stadium architect, China olympic stadium china

Beijing Olympic Stadium, Beijing Olympics 2008, Birds Nest building, Herzog DeMeuron

Laoshan Velodrome-LSV-Functions during the Games: Cycling track

November 16, 07 by Ballz Sports

Img2119022
Bird’s eye view

Venue: Laoshan Velodrome

Location: Laoshan, Shijinshan District, Beijing

Total land surface (sq. m.): 32,920

Seats: 6,000

Functions during the Games: Cycling (track)

Groundbreaking date: Oct. 30, 2004

Img2119023
Scenograph
Img2119024
Laoshan Velodrome under construction
Img2119025
Laoshan Velodrome under construction

Wukesong Indoor Stadium-WIS

November 16, 07 by Ballz Sports

Img2119019
Effect mode

Venue: Wukesong Indoor Stadium

Location: Wukesong Culture and Sports Center

Total land surface (10,000 sq. m.):6.3

Functions during the Games: Basketball

Post-Games use: The stadium, which includes Wukesong Indoor Stadium, Wukesong Baseball Fields, and sports and commercial facilities, will be able to meet the needs of residents in western Beijing

Groundbreaking date: March 29, 2005

Img2119020
Wukesong Basketball Stadium
Img2119021
Effect model

Beijing Olympics Stadium, Beijing Olympics Buildings, 2008 beijing olympics buildings, china beijing olympics buildings, 2008 beijing olympic buildings, beijing olympic buildings,2008 beijing olympic stadium, beijing olympic stadiums, beijing olympic stadium construction, beijing olympic stadium 2008, beijing olympic stadium design, beijing olympic stadium pictures, beijing olympic stadium photos, new beijing olympic stadium, beijing olympic stadium architect, beijing olympic stadium china, China Olympics Stadium, China Olympics Buildings, 2008 China olympics buildings, china China olympics buildings, 2008 China olympic buildings, China olympic buildings,2008 China olympic stadium, China olympic stadiums, China olympic stadium construction, China olympic stadium 2008, China olympic stadium design, China olympic stadium pictures, China olympic stadium photos, new China olympic stadium, China olympic stadium architect, China olympic stadium china

Beijing Olympics Shooting Range Hall

November 16, 07 by Ballz Sports

Venue: Beijing Shooting Range Hall

Location: Shijingshan District, Beijing

Total land surface (sq. m.): 45,645

Functions during the Games: Qualifications and finals of 11 shooting events, consisting of all 10-meter, 25-meter, and 50-meter range shooting events. The entire shooting sports of the 2008 Paralympic Games will also be held in the venue.

Groundbreaking date: July 13, 2004

Beijing Olympic National Indoor Stadium

November 16, 07 by Ballz Sports

Img2119016

Venue: National Indoor Stadium

Location: Olympic Green

Total land surface (10,000 sq. m.):8.09

Functions during the Games: Artistic Gymnastics, Trampolines, and Handball;

Post-Games use: The venue, one of the best sports facilities in Beijing, can be used for sports competition, cultural and entertaining purposes, and will serve as a multi-functional exercise center for local residents.

Groundbreaking date: May 28, 2005

Img2119017
Img2119018
Close
E-mail It